NEW DELAYED COKING UNIT (DCU) - OMSK REFINERY

Scope of work: EPCM

Country: Russia

Client: JSC GAZPROM NEFT - Omsk Refinery

Status: ongoing

Project highlights

2.0 MM T/y

(34,500 BPSD) capacity

Tecnimont Russia LLC has a core role in the execution of the Project
Strategic for Omsk Refinery, one of the largest worlwide

JSC Gazpromneft Omsk Refinery awarded Tecnimont the execution of a New Delayed Coking Unit (DCU) at Omsk Refinery, Russia.
Today, Omsk Refinery is one of the most sophisticated refineries in the country and among the largest globally, with an overall capacity of about 21.3 MTA (million tons per year) of crude oil processing.

Awarded on lump sum basis for Engineering and Procurement and on reimbursable basis for the Construction, Pre-Commissioning and Commissioning Management (EP+Cm), the project involves a new Delayed Coking Unit (DCU) designed to process 2.0 MM T/y (34,500 BPSD).
The Project will be executed inside the existing Omsk Refinery and will be mainly aimed at expanding its capacity for the conversion of heavy residues while maximizing liquid product and producing anode grade quality coke. A significant portion of the scope of work will be performed by Tecnimont Russia LLC in its Moscow operating center, where Maire Tecnimont Group already has more than 150 people working on the other ongoing Russian projects. Tecnimont Russia represents therefore an asset within the Group with a growing reputation as a provider of added value services to the local Russian market.